All posts by Danny Scroggins

Membership

Are you a member of Swindon Panel Society yet? If not, there has never been a better time to join!

If you are a bronze member, perhaps you might like to consider upgrading to Silver!

The panel is now in Didcot, fully in our possession, and it’s no longer a question of ‘if’ it’s preserved and brought back to life, it’s ‘when’!

The ‘when’ currently depends on fundraising, so if you’ve followed our progress with interest thus far, please consider joining the Society. There are two levels of membership, starting from just £5. You’ll receive a membership card, email updates, you can visit, and play with, the panel as much as you like when we are open (or even when we’re not as a silver member!). Silver members also receive our popular news magazine with many interesting reports and stories about the preservation work.

Swindon Panel needs you!!

Panel moved – thank you

Thank you to the volunteers in attendance at our additional Swindon Panel Day last weekend – the panel was successfully moved across the room in order to make more work space and room for plastering behind the panel.

The panel will stay in its new position for the next several months while the wiring in the back of the panel is installed.


Look at all this lovely space behind the panel we now have!

Newsletter Binders

Swindon Panel Newsletter issue 14 is currently in the post (and email copies will be coming out to Bronze members shortly). We are now delighted to have available brand new high-quality binders for your Swindon Panel newsletters!

Very similar to those available for The Signalling Record from the SRS, and numerous other clubs and Societies, these dark red binders have a sprung cord system inside that allows up to 12 SPS A5 newsletter magazines to be held in each binder. They will be embossed “SWINDON PANEL SOCIETY” on the spine (not “The Fairground Mercury” – that’s just the sample!) The binders look very professional on bookshelves and are a great way to preserve your collection of Swindon Panel newsletter magazines.

The binders are available for £10 each.
Please email us to place your order.

If you have any ‘gaps’ in your collection of SPS newsletters we may be able to fill them from our spares in return for a donation to SPS’s funds. Please let us know if you would like any back issues and we will establish what we have available. Some of our earlier newsletters were issued in A4 size. If there is sufficient interest we may produce reformatted versions of these in A5 booklet size to make the collection consistent and fit nicely into these binders.

Work Week 2

Thank you to everyone who joined in with Work Week 2 at Swindon Panel.

Testing and Recording


A great deal of testing took place of the panel wiring and alterations during the week. This involves feeding the tags at the back of the panel and confirming the correct combinations of lamps, switches, buttons and buzzers respond on the front of the panel. There were, of course, three temporary fringes in the closure of the panel (at Loco Yard, Rushey Platt and Brinkworth), so it has been necessary to undo the effects of these.

Electronics Fitting


We made great progress on the fitting of electronics in the panel in readiness for the simulator. These jobs are generally small and fiddly, rather than physically demanding, such as dealing with the PCB components or DIN rails in the panel, but in our case they are often required hundreds of times for all the fittings required, so take a while!

Cable Manufacture


A large number of plug-ended cables are required in the panel, and our young workforce was put to good use in testing and installing these.

Finally, on the last day, all of our tools and equipment were packed away to leave the room empty of everything except the panel in readiness for plastering of the walls to take place which should now be under-way!

When half the room has been plastered, the panel will be moved forward to the other side of the room to allow the rear wall to be plastered, and also to give better access for work in the rear of the panel.

Soldering Update

Hello

Thank you for helping with Swindon Panel soldering!

The components have started to be sent out now, so you will shortly receive one board, plus components. I am sending everyone one board first (despite protests!) This is for two reasons – firstly to make sure that the instructions are correctly interpreted, as a minor ambiguity on the part of the instructions could otherwise lead to numerous wasted boards, and also just in case anyone’s skills… might better suit them to helping in other ways(!)

(I’m sorry it’s taken a while to get these out, the job has been more time-consuming than I first thought).

Please make sure you see the tutorial videos on YouTube – just search for “Swindon Panel PCB Tutorial” on YouTube and you’ll see them. There are three – one for each type of the different types of board.

Input: https://www.youtube.com/watch?v=8vE3toCWMY4

Output: https://www.youtube.com/watch?v=yJGVFk077Xg

Flasher: https://www.youtube.com/watch?v=xbP6B8EGwbk

For identification, the input boards are blue, the output boards are small and red (approx. 3″x4″), the flashing boards are large and red (approx. 4″ x 5″).

A couple of points that have come up over the last few weeks:

– Ventilation – please ensure you solder in a well-ventilated environment. The solder fumes aren’t very good for you.
– Flux cleaning – Several people have asked about this. If you have the tools and skills to do this and wish to then please feel free. If not then no problem. Please let us know if you do do this.
– The tip cleaning sponge is mentioned in the video, but never seen in use…….. (sorry!)
– A tip, particularly for the terminal blocks and similar larger items, is to hold them in place with a blob of Blu Tack so they are held square and don’t fall out when you turn the board over.
– The serial numbers have not been supplied, so please ignore this requirement.

Thanks to everyone for these comments.

If you have any problems or you find you have made an error that you’re not confident to correct, please return the board to us in whatever state it is in. We have one or two “professional” solderers in the Society who can do “difficult” repairs.

Transistors supplied for flashing and output boards are in anti-static bags. There is no enormous risk to these, but if you could avoid touching them while wearing a nylon tracksuit on a carpet floor while holding a vandagraph generator in your other that… That would be appreciated! These boards can go into the anti-static bag provided to be sent back.

All PCBs can then go into the padded envelope they are sent in to be sent back.

Please send the boards back to :

Swindon Panel Society, Didcot Railway Centre, Station Road, Didcot. OX11 7NJ.

Please include a note (or mark on the envelope) your name so that we know who it’s from!

Thank you very much indeed for your help – please let us know if you have any queries.

Thanks!

Danny S.

First Stage of Bristol PSB Farewell

Farewell this weekend, as we start to say good bye to one of Swindon Panel’s neighbours – the first part of the Stoke Panel in Bristol PSB has been decommissioned and is being recontrolled to TVSC.

The lines moved are those that were commissioned under stage 7B of the Bristol MAS scheme on 22 February 1971: Winterbourne to Patchway, Filton Jn and Hallen Marsh. It replaced the boxes at Filton Junction, Filton West, Stoke Gifford East, Stoke Gifford West, Patchway and Cattybrook.


The map of Stage 7B of the Bristol MAS scheme in 1971. Click for a larger version.

Bristol Stoke will still control, for the time being, the Charfield lines to the fringe with Gloucester and the Badminton lines fringed by TVSC on both sides (in the east where it used to fringe with Swindon PSB.) This area would have been decommissioned some time ago, but was delayed by the delays to the closure of Swindon PSB.

The photos above show two parts of Bristol Stoke Panel in 2007.

When the Bristol MAS scheme was started in 1970 BR proudly launched a large public awareness campaign called “Starting Something Big at Bristol”, with large banners at the front of Temple Meads station. Bristol was the largest panel box Western Region had ever installed, they were proud of it, and wanted everyone to know.

The campaign distributed information to the public about the scheme and how it would improve the management of rail traffic, and managed their expectations about the necessary service alterations that would take place during the process. Open meetings were held for the railwaymen and women of the time to attend and raise questions etc about the scheme. As with all large-scale industrial changes such as this there was some considerable upheaval for the staff concerned, not unlike the present-day scheme. One of the then-signalmen, Peter Randall, wrote an excellent contemporaneous book about the resignalling and the social and operational impact that shared the name “Starting Something Big at Bristol”.

The current resignalling, slightly less proudly called “BASRE” (Bristol Area Signalling Renewals and Enhancements), is driven by three main factors: life-expiry of the 1971 equipment, the requirement for AC-immune signalling in readiness for electrification, and the re-four-tracking of Filton Bank to deliver capacity enhancements. The scheme, which includes Bristol Temple Meads and everything north and east thereof, will require over 700 signalling equivalent units (SEUs). A large number of WR MAS gantries and cantilevers will be replaced, connections to a new IEP depot at Stoke Gifford will be commissioned, and the St Andrew’s Crosses at Temple Meads with mid-platform signals, and of course all the WR E10k electro-mechanical relay interlockings will be replaced with solid-state interlockings, relocked and recontrolled to TVSC under the ‘85% compliance approach’ which means existing signal positions remain largely unchanged.

If you have memories of working in Bristol Panel or on the Bristol area, or photos from the panel, especially in its early days, please do share them with us in the comments below.

Good luck to everyone involved in the decommissioning, the commissioning, and the well done to everyone who has worked in Bristol Panel, upstairs, downstairs, or outside, over the last 45 years.

The photo below shows Swindon Panel’s fringe to Bristol Stoke.

Soldering Call to Irons

Are you good at soldering? If so, and you’d be prepared to do a bit of soldering at home for us, Swindon Panel wants to hear from you!

Our new simulator, which has been under research and development for the last two years, requires a lot of PCBs to interface it with the panel (approx 350). These have been designed in-house and produced, and all the components have been delivered. All we need now is for the components to be soldered on.

If you are good at soldering and would be happy to have some boards and components posted to you for you to solder up at home and send back to us, we would love to hear from you.

It’s not even necessary for you to travel to Didcot to be involved in SPS!

Three tutorial videos are available to help, which will also give you an idea of the task required:
Tutorial 1 – Input Boards
Tutorial 2 – Output Boards
Tutorial 3 – Flashing Output Boards

There are also written step-by-step sheets.

If you would like to help please let us know by reply, or any of the other usual communications channels, and please give us an indication of your soldering confidence or skill level.

When we have a group of helpers ready to solder we will initially send you one input board (blue) and components. This is the simplest of the three boards, and we will ask you to solder them up as per the instructions and send it back to us. This is to check that the instructions are correctly understood and avoid wastage from producing many boards incorrectly due to any misunderstanding in the instructions.

Once this initial board is confirmed as correct we will send you a batch of boards and components. After you’ve done one you’ll be able to give us an indication of how many you’d like to receive in a first batch.

Once you’ve soldered up the batch, you can send them back to us at Didcot and we will insert them into the panel.

Easy as that!

We hope you will not mind being asked to complete one board as a demo. We felt this was necessary as the boards are expensive to produce, and we don’t want to see a batch wasted due to any misunderstanding of the instructions.

Thanks!

Danny S.


Above: An SPS input board before components are soldered on.
This PCB requires:
– 1 x 2-way screw terminals (for power)
– 1 x 8-way screw terminals (for connecting to the panel)
– 4 x 8-pin IC holders
– 1 x 9-pin resistor array
– 8 x resistors
– 1 x 10-pin DIN header
– 1 x 0.5a fuse

That Was the Work Week that Was

Thank you to everyone who joined in with work week at Swindon Panel last week.

Some great progress was made by the Panel Society and the Great Western Society Civil Engineering (CE) Group.


Uffington Loops 1986 or 2016…..?

Uffington Loops were the only point of refuge between Highworth Junction and Steventon after the line between Challow and Wantage Road was de-quadrupled and Marston Crossing loops were closed in the 1960s.

The loops were removed in the early 1990s when Challow-Wantage was re-quadrupled in response to the increase in coal traffic between Avonmouth and Didcot Power Station.

Considerable effort was required to reinstate the loops in the preserved Swindon Panel as the surrounding tiles had been moved around considerably.


The red team installed the new panel top plates that had been delivered from Henry Williams to help up return the panel to its 1980s state. This also required the configuration of numerous mechanisms (the metal housing underneath the tile, below left) and bases (the electrical terminals in the panel, below right) built up from spares.



Several new components were made and configured for the simulator installation, such as this voltmeter and ammeter instrument for the simulator’s three power supplies.



The last of the wiring that linked the tag blocks to the relay room at Swindon has now been removed (hurrah!). There is some further tidying up to do, and then….. yes, for every wire we removed we have to solder a new one back on!



The glazing has started to be installed in the reclaimed cast windows. There are 12 panes required in each of the 4 main windows, plus a couple of smaller ones. Each has to be individually installed and puttied into place.



A considerable construction of ‘Dexion’-style slotted racking has been installed in the back of the panel. This is to support the extensive microelectronic simulator that will be installed in the back of the panel.


The panel simulator power supplies have started to be installed and wired in. Here is the main power area (‘bay 0’). There will be 8 other ‘bays’ of simulator equipment stretching the entire length of the panel.
In addition, the simulator room has started to be built. This is a small room in the Bristol Room where all our computer equipment will live, and the simulator operator will sit (when required).

Also, the GWS S&T Dept, who are the main leaders in the installation of signalling exhibits in the Bristol and Brunel Rooms have started to make great progress in starting to shape the display areas etc in this part of the building.

More photos from 2016 Work Week 1 are available in our Photo Gallery.


2016 Work Week 2….
Just around the corner!

Work Week Part 2 is Saturday 20 to Monday 30 August… and you can be involved!

Work week is a great time for a concerted effort of progress on the panel – it feels really great to be part of the team and see progress being made!

Tasks for Work Week 2 include:

“The Prod Test” – attaching a prong to each of the tags in the back of the panel and confirming that the correct lamps on the front illuminate in the correct combination. This is important in order to identify any irregularities or inconsistencies in the panel wiring, and also to confirm our alterations have been successful, before they panel is connected to the delicate simulator electronics.

Panel Domino Construction – Continuing with the task of reconfiguring and compiling new bases and mechanisms that the panel requires to work (second half of the week).

DIN Rail Installation – The back of the panel is now fitted with racking ready to accept DIN rails. 7 bays of 5 DIN rails are required, which will then require clips attached for 10 PCBs to live on each one. Yes – 350 PCBs! Once the clips are in, it’s time to chase cables from the future position of each PCB to its appropriate tag block.

Tag Looping Alterations – Some alterations are required to the orange ‘looping’ on the tag blocks. This is because our simulator will be wired slightly differently to how the real interlocking was (but will work in exactly the same way).

Component packaging and/or soldering – The many thousands of components for the simulator require sorting and packaging up for sending out to the soldering army…… more about that later!

Window glazing fitting and door frame carpentry – If you fancy something a bit more heavy-duty, the CE group will be continuing their work of installing the windows and doors on the building.

As you can see there is plenty to do, hopefully something for all tastes. The Railway Centre will also be open and is fascinating to look round.

So if you have a spare day or two, come and join us and help bring the completion of the preservation of your favourite panel a little bit closer!

Network Rail employees…. remember, you can get paid by NR for volunteering with Swindon Panel! Read more….

Get involved in Work Week!

Get involved in Work Week!

Don’t forget, Swindon Panel is taking part in Didcot Railway Centre’s “Work Weeks” in August. This is where teams from many groups of the projects around the site have a concerted week of work on their favourite projects. It hopefully helps to get new people involved as well.

The work weeks are: 30 July – 7 August and 20 August – 29 August

SPS will be in attendance every day – 10am until 4pm (or finish) – and you are welcome to join us!

Some of the many tasks on the Agenda:
– Progress fitting of doors to the panel building.
– Stripping of redundant cables from inside the panel
– Preparing metalwork (painting, drilling, etc) for simulator frame
– Installing framework in the rear of the panel
– Soldering of components to simulator PCBs
– Turning the panel frame so that the direction of roll is forwards-backwards instead of side-to-side
– CE group building work if you prefer something heavier-duty!

There will also be activities planned such as evening opening of the Black Python bar, and a trip to the Fawley Hill Railway near Henley on Thursday 4 August.

Hot food is available on site from the restaurant.

More details of DRC’s work week are available on their website.

It would help us to plan if you could let us know if you plan to attend and roughly which days. There is no cut-off date to join in, dropping-in on the day also welcome!

Network Rail Employees……

Did you know…

Network Rail encourages its employees of all grades to take 5 days’ paid “volunteer leave” per year to support UK-registered charities.

The company believes social performance is an integral part of its commitment to sustainability, particularly in two key themes of “Caring for Communities” and “Improving the Passenger Experience”. Respecting Britain’s Railway Heritage falls within these themes, and therefore working with Swindon Panel Society (registered charity number 1159646) qualifies. Some SPS members have already enjoyed the benefits of this opportunity.

What could be better than being paid to enjoy your hobby!

One of the two Work Weeks are an ideal opportunity to take advantage of this.

To arrange your volunteer leave to volunteer with SPS:

* If you use E-Business you will need to request your leave via Leave of Absence on the E-Business Suite. Select Volunteering “Charitable or Volunteering Community Engagement” from the absence type.

* If you do not use the E-Business Suite you’ll need to complete a volunteering leave form, available on Connect. You will need your line manager’s agreement to be released from duty.

* If you complete a paper timesheet you will also need to add this as volunteering leave.

Please to the Volunteering leave policy (available on Connect), before requesting your leave.

If you need any help with volunteering ideas please email the “Charitablegiving” mailbox in the Outlook address book.

AND…

Even if you don’t work for Network Rail, your company might have similar volunteering schemes