The floor in the Swindon Panel room is now being laid!
The first third of the floor was laid on Tuesday 2 February and the next thirds will be laid on 16 February and 1 March (both Tuesdays).
The current floor is the concrete foundation slab, on top of which is now several layers of membrane and insulation, which will all being concreted in on these three Tuesdays. This will make the final floor level onto which carpet tiles will be laid.
If you are able to help on these Tuesdays (16 Feb and 1 March), please get in touch with Richard Antliff at DRC (via us if you wish).
Thanks!